2+2  |  The length 17.4 km  |  12 bridges   |  2 interchanges
Interchanges:  Dunajská Lužná »  |  Šamorín » 

Prázdny
Prázdny

NEWS 

The R7 Dunajská Lužná – Holice Section starts between the municipality of Dunajská Lužná and the town of Šamorín at the elevated “Dunajská Lužná” crossing. The entire Section runs along the left side of the I/63 road and ends at the elevated “Holice”.

Construction and operation of this section of expressway will exclude transit traffic from the territory of surrounding villages and improve the impact of traffic on people and the environment. The beginning of this section is located between village Dunajská Lužná and town Šamorín where construction continues the section of R7 Ketelec – Dunajská Lužná after the junction “Dunajská Lužná”. This section of R7 runs along the left side of the road I/63 for the entire length, mainly on agriculturally used land. From the connection with the previous section, the route begins to divert to the north from the direction of the road I/63, in order to bypass the town of Šamorin from the northern side. At aprox. 0,800 km the route crosses a regional biocorridor Danube – Malý Dunaj.

The route then enters the space between the town Šamorín and the village Kvetoslavov (closely to village Kvetoslavov). At this point the route crosses the road II/503, on which it is connected via the interchange “Šamorín”. The route continues around village Šamot from the northern side and around village Čukárska Paka from the southern side. At ca. km 9,000 near the site called Tárnoki, an ecoduct is designed to ensure the possibility of crossing over R7 for migrating wildlife. At this point the route crosses the border of the II. grade protection zone of natural healing water near Čilistov. The route then passes between the villages Trnávka and Macov where, on the right side, a sport-recreational complex (shooting-range) is located, but will not affected by the construction. For the final section, the route is lead northwards from the village Blatná na ostrove and again approaches the road I/63. The route of this R7 section ends between the villages Holice and Čechová at the interchange “Holice” with a connection to roads III/06324 and I/63.

Project sections

The D4 motorway 

Jarovce

Ivanka Sever

__

22,59007 km

The D4 motorway

Ivanka sever

Rača

__

4,400 km

The R7 expressway

Bratislava Prievoz

Ketelec

__

6,318 km

The R7 expressway

Ketelec

Dunajská Lužná

__

0,200 km + 8,225 km

The R7 expressway

Dunajská Lužná

Holice

__

17,380 km